User Tools

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
doc:new_software [2025/03/06 10:24] – [Request the Software] sha4eadoc:new_software [2025/03/06 15:45] (current) – [Rollout the Software] sha4ea
Line 1: Line 1:
-====== Process for a new Software ======+====== Software request process ======
  
-The following step-by-step guide defines the process, how a new software product is made available on BAUWELT computers. **Typically this process takes about 3 weeks.**+The following step-by-step guide defines the process, how a new software product is made available on BAUWELT computers. **Please request your software 3 weeks before you need it.**
    
 ===== Request the Software ===== ===== Request the Software =====
Line 11: Line 11:
  
  
-===== Integrate the Software =====+===== Test the Software =====
  
-  - The requested software product gets integrated into the master image of the BAUWELT student computers or will be made available on the central computing infrastructure+  - After the new software product has been configured by us, we are going to deploy the new configuration to a group of test computers where you are asked to test the final setup
-  If we need your specific knowledge about how to configure the software or when we need your license information, this would be the point in time when we ask for your help.+     * Is the software working as expected, start, performance, basic operation? 
 +     * Are all functions available to perform your course exercises or trainings? 
 +     * Are possible example data loading correctly or can they be imported correctly? 
 +\\ <wrap hi>If we require your expertise in configuring the software or need your license information, we will reach out to you at this stage.</wrap> 
  
-===== Test the Software ===== 
  
-  - After the new software product is integrated into the master image, we are going to deploy the new configuration to a group of test computers where you are asked to test the final setup. 
-    * Is the software working as expected, start, performance, basic operation? 
-    * Are all functions available to perform your course exercises or trainings? 
-    * Are possible example data loading correctly or can they be imported correctly? 
  
-===== Rollout the Software =====+===== Software Rollout =====
  
-  - Now we made the software product available for production on every BAUWELT student computer +  - After a successful testing phase, we will install the software on all BAUWELT computers. 
-  - Starting from now, students can use the software product+  - Starting from now, students can use the software product.